16 TAC § 78.100 • ANSI/IICRC S520 • STATUTORY WORK SPECIFICATION

Engineered Mold Remediation Protocol (MRP)

Texas law requires a licensed Mold Assessment Consultant’s written blueprint whenever fungal damage meets or exceeds 25 contiguous square feet. Give contractors exact containment boundaries, negative-air physics, flood-cut elevations, and clearance benchmarks.

Same-Day 4–8 Hr STAT Turnaround Available • Unlocks Statutory TDLR 5-Day Notification & Fair Contractor Bids

Envirogyn Written Mold Remediation Protocol architectural floorplan containment and flood-cut elevations
PROTOCOL ENGINEERING CONTROLS

What Every Envirogyn Protocol Locks Down

A strong protocol leaves zero ambiguity for the contractor, protects occupants outside containment, and simplifies insurance claim approval.

01 • CONTAINMENT & NEGATIVE PRESSURE

Double-Layer 6-Mil Poly & -0.020 in. wc

Specifies floor-to-ceiling fire-retardant polyethylene sheeting, 3-stage decontamination airlocks, continuous HEPA filtration (≥4 ACH vented outdoors), and continuous digital manometry.

Order Written MRP →
ANSI/IICRC S520 negative-air polyethylene containment zipper entry and decon barrier
02 • REMOVAL & ZERO-BIOCIDE HYGIENE

+24" Flood Cuts & HEPA Abrasion

Porous drywall and insulation are demolished at least 24 inches past all visible staining or damp boundaries, followed by structural wire-brush abrasion and HEPA vacuuming — prohibiting chemical fogging.

See Post-Work PRV Verification →
Mechanical HEPA vacuum and wire-brush abrasion cleaning exposed structural framing without chemical masking
03 • SOURCE & PRE-DEMO GATES

Moisture Repair & Asbestos / Lead Checks

Requires plumbing or envelope leaks to be corrected prior to clearance, and enforces pre-demolition NESHAP asbestos & EPA RRP lead-paint compliance before disturbing suspect materials.

Pair With Initial Assessment →
Infrared wall assembly moisture boundary determining +24 inch flood cut zones
04 • PROCUREMENT TRANSPARENCY

Equal-Scope Contractor Bidding

Eliminates contradictory restoration quotes by fixing exact square footage, HVAC shutoff locks, PPE respiratory classes (NIOSH P100), and objective PRV pass thresholds upfront.

Add Pre-Bid Work Plan Audit →
Mold Assessment Consultant reviewing floorplan containment lines and remediation specification
BLUEPRINT SPECIMEN • 16 TAC § 78.100

Inside a 4-Page Envirogyn Mold Remediation Protocol

Each written MRP provides crystal-clear engineering tables, wall-by-wall cut dimensions, HEPA abrasion rules, HVAC isolation directives, and exact PRV clearance criteria — immediately actionable by any Texas-licensed Mold Remediation Contractor.

≥25 Sq Ft Texas statutory trigger threshold
-0.020" Mandatory negative air pressure wc
0 Biocides EPA & S520 mechanical source removal
Sample Texas Mold Remediation Protocol Page 1 containment architecture and PPE specification table
MRP PAGE 1 • Containment Architecture, Negative Air & PPE
Sample Texas Mold Remediation Protocol Page 2 zone map diagram and demolition cut schedule
MRP PAGE 2 • Flood-Cut Elevations & Removal Matrix
PROTOCOL & CLEARANCE BUNDLES

Order Your Written Mold Remediation Protocol

Fast digital delivery ready for contractor TDLR 5-day advance filing and insurance submission.

MAC-105 $450 / protocol
Same-Day STAT (4–8 Hr)

Standalone Statutory Mold Remediation Protocol (MRP)

Written Texas work specification when diagnostic data already exists — engineered for projects ≥25 contiguous sq ft requiring immediate TDLR 5-day contractor filing.

Signed MRP Blueprint Inspect MRP Specimen →
MAC-104 $895 / combined
24–72 Hr Combined

Combination Mold Assessment (MAR) & Written MRP

Complete on-site forensic inspection, FLIR/moisture logging, 4 ASCP laboratory samples, and the full engineered Mold Remediation Protocol in one deployment.

MAR Report + MRP Blueprint See MAR Scope →
PRV-201 $445 / event
Post-Work Release

Post-Remediation Verification (PRV) & CMDR Sign-Off

Independent post-remediation inspection confirming your contractor achieved every negative-air, dry-standard (≤16% MC), and air-parity clause in the protocol.

PRV Certificate + MDR-1 PRV Details →
TEXAS SEPARATION OF DUTIES • TEX. OCC. CODE § 1958.155

Objective Findings Without Remediation Conflict

Texas law prohibits the same entity from writing a remediation protocol or performing Post-Remediation Verification (PRV) on the same project where it performs contracting work. When Envirogyn serves as your Mold Assessment Consultant, we deliver unbiased thermal diagnostics, calibrated ASTM lab counts, written Mold Remediation Protocols, and independent PRV clearance — while recommending zero remediation upsells.

Review Texas TDLR Standards →
REGULATORY & TECHNICAL FAQ

Mold Remediation Protocol FAQ

Everything homeowners, adjusters, and builders need to know about 16 TAC § 78.100 MRPs.

When is a written Mold Remediation Protocol (MRP) legally required in Texas?

Under 16 TAC § 78.100 and Tex. Occ. Code Ch. 1958, any mold remediation project affecting 25 or more contiguous square feet requires a licensed Mold Assessment Consultant to prepare a written Mold Remediation Protocol prior to work start, and a licensed Mold Remediation Contractor to submit a 5-day TDLR notice.

What does an Envirogyn Written MRP specify?

Our MRP specifies containment design (full 6-mil fire-retardant poly vs mini-enclosure), 3-stage decontamination airlocks, continuous negative-air filtration (≥4 ACH at -0.020 in. wc), HEPA vacuum + wire-brush mechanical abrasion, +24-inch flood-cut drywall margins past wet substrates, PPE tiers, NESHAP asbestos/RRP pre-demo safety gates, and PRV clearance benchmarks.

Should I get a Mold Assessment + Protocol Combo (MAC-104, $895) or Standalone MRP (MAC-105, $450)?

Order Standalone MRP (MAC-105, $450) when you already possess a valid recent Mold Assessment Report or contractor-scoped emergency loss and urgently need the statutory blueprint (4–8 hr STAT turn available). Choose MAC-104 ($895) when you need Envirogyn to both perform full forensic diagnostics/lab testing and draft the remediation protocol.

How does an engineered MRP save homeowners and adjusters money?

Without a detailed MRP, competing contractors quote completely different scopes — one bidding cheap spraying and another bidding full containment. An MRP forces every contractor to bid the exact same linear cut lines, HEPA scrubbing hours, and rebuild clearance standard.

Why do Envirogyn protocols prohibit bleach, fogging, and chemical encapsulants during abatement?

Spraying fungicides or paint-over sealants onto dirty wood hides residual spores and allergens without restoring Condition 1 hygiene. Both ANSI/IICRC S520 and the U.S. EPA require physical removal of porous substrates and mechanical HEPA abrasion of structural framing.

Call (281) 694-5742