OPERATION: CRITICAL DRYING & MICROBIAL CONTAINMENT
COMMERCIAL MEDICAL COMPLEX
14,200 sq. ft. outpatient surgical clinic. Pressurized Category 3 hydronic HVAC loop failure. Initial psychrometrics: 78.4°F / 88.6% RH / 132 GPP. Wall framing registered 34.2% WME with imminent risk of cross-contamination into clean surgical theaters.
PRESSURE CONTROL & DESICCANTS
Constructed airtight poly containment with zipper airlocks maintaining -0.032 in-WC negative pressure differential. Deployed six 2,000 CFM HEPA air filtration units generating 8.2 ACH. Mobilized 5,000 CFM desiccant unit delivering < 34 GPP deep-cavity vapor removal with EPA botanical sanitization.
95.9% SPORE REDUCTION
Spore trap sampling confirmed indoor levels dropped from 8,460 outdoor baseline to 340 spores/m³. Zero marker pathogens detected on culture plates. State Certificate of Mold Damage Remediation (TDI Form MDR-1) issued within 6 days.